Shipping MVPs Without Debt
Product

Shipping MVPs Without Debt

Fast iteration without accumulating technical debt

Jan 28, 2026
10 min

The MVP Trap

Most MVPs ship with accessibility debt, performance problems, unmaintainable code. "We'll fix it later" becomes never. Technical debt compounds. Velocity drops 6 months in.

The Non-Negotiables

Even in MVPs, we ship with: semantic HTML, accessible navigation, performance budget, consistent design tokens, test coverage on critical paths. We cut scope, not quality.

What We Cut vs Keep

CUT: Advanced features, animations, edge case handling, third-party integrations. KEEP: Core user flow, accessibility, performance, clean architecture, design system foundation.

The Process

Week 1: Core user flow only. Week 2-3: Polish core flow, add essentials. Week 4: Performance audit, accessibility check, deploy. Post-launch: Iterate based on usage data.

Outcomes

Shipped 3 MVPs in 6 months. Zero accessibility debt. All passed Core Web Vitals. Iteration speed stayed consistent. No major refactor needed after launch.

Key Takeaways

Related Insights

CTA background

Let's apply this to your product.